Enterprise manufacturing platform — Book a structured demo. Schedule an executive briefing.Book a demo
FOSFactoryOperating System

Production

Production — Work Orders, WIP & Shop Floor Control

Track every work order station by station in real time — WIP, bottlenecks and downtime visible as they happen, including subcontracted jobs.

Live shop-floor tracking · Tablets at every station

  • Real time WIP visibility
  • Live OEE by centre
  • Clear Bottlenecks
  • 1 Unified timeline

Answer

What is shop floor management? What is WIP tracking?

Shop floor management is how work orders move through stations — issue, operation complete, scrap, and hold — with clear ownership on the plant floor. WIP tracking shows quantity and status of open work between issue and finished goods. FOS Production gives live station visibility and ties WIP to MRP plans, quality gates, and inventory.

Why teams switch

Crores of machines — run on a whiteboard.

Production isn't another clipboard. It's live WIP, OEE and subcontracted work on one timeline — visible as it happens, not at day's end.

Walk through the product
  1. 01
    Job progress known only at day's end

    Supervisors learn what's running when the shift closes — not while they could still act.

  2. 02
    Bottlenecks spotted after they've cost you

    Constraints show up in the review meeting — after throughput and delivery already took the hit.

  3. 03
    Machine downtime nobody logs or explains

    Stoppages happen on the floor — but OEE stays a guess because reasons never get captured.

  4. 04
    Subcontracted work off the radar entirely

    Material goes out to vendors with no live view — so in-house and outside steps never share one timeline.

Product walkthrough

The floor, in real time.

Three moments that replace clipboards and guesswork with live shop-floor control.

TrackStation · WIP · Queue
MeasureDowntime · OEE · Constraint
ConnectIn-house · Subcontract · Timeline

Track live

Every work order, tracked live.

Operators punch progress from a tablet at each station. Supervisors watch WIP and bottlenecks as they happen — not at the next review.

  • Station-wise job punching
  • Live WIP & queue
  • No end-of-day surprises
1Cutting & Nesting
Done · 4h 12m
2Welding — Station B
In progress · 62%
3Surface & Paint
Queued · 15:30
4Assembly & QC
Waiting
Live WIP visibilityReal time
Connected platform

Work orders flow into Quality & Subcontracting

Planned jobs hit the shop floor live. Inspections gate the next step. Outside work stays on the same timeline — no re-keying between modules.

Production Shop-floor execution You are here
Capability map

Everything the shop floor needs — in one view

Job tracking, OEE and subcontracting — connected to planning and quality.

Job TrackingStation punching, live WIP, queue view
Work OrdersRouting, material issue, labour booking
Downtime & OEEDowntime reasons, OEE, utilisation
Shop-floor DashboardWIP, bottlenecks, throughput, delays
Subcontract JobsMaterial issue, receipt, reconciliation
TraceabilityBatch, serial, operator, machine

We used to walk the floor twice a day just to know what was running. Now supervisors see WIP and bottlenecks on a tablet — and when galvanising is out at a vendor, it's on the same board as welding.

Executive briefing

Run the floor in real time.

A focused 30-minute walkthrough of Production — mapped to your shop-floor process, stations and subcontract flow.

  • Structured implementation plan
  • Industry-specific scope
  • Response in 1 business day

Frequently asked questions.

Top questions about production management software — answered for manufacturers in India.

What does FOS production module cover?

FOS production covers work order release, operation tracking, material issues, labour reporting, scrap, and completion — connected to planning and inventory. Shop-floor teams record progress against routings without duplicate paperwork.

Can operators report by operation or work centre?

Yes. Operators start and complete operations at each work centre with quantities good and rejected. Partial completions update WIP so planners see accurate status without waiting for shift-end batch entry.

How does material issue work on the shop floor?

Material issues follow BOM allocations with backflush or manual issue options. Shortages flag against the work order before operations complete, reducing surprise stock-outs mid-job.

Does FOS support batch and serial tracking?

Batch and serial attributes can be captured at issue, production, and dispatch for traceability. This supports auto and quality-intensive industries where genealogy matters for recalls and audits.

Can we track subcontract operations in production?

Subcontract steps appear on routings with challan and receipt flows. Production views show material at vendor and expected return dates alongside in-house WIP.

What shop-floor devices does FOS support?

FOS runs in browsers on PCs, tablets, and industrial touch screens. No heavy client install — operators log in with role-based screens sized for the plant floor.

How is scrap and rework handled?

Scrap quantities post to orders with reason codes; rework routes can send jobs back to prior operations or quality. Costs flow to order variance reports for continuous improvement tracking.

Can production managers re-prioritise work orders?

Supervisors reschedule sequence within work centres and reassign overloads when machines break down or rush orders arrive. Changes reflect immediately on operator queues.

Does production connect to quality holds?

In-process quality failures can block next operations until inspection passes. Dispatch stays blocked for failed final inspection — production and quality share the same order status.

What KPIs do production dashboards show?

Dashboards highlight output vs plan, WIP ageing, downtime reasons, scrap rates, and order backlog at each work centre. Plant heads use these for daily production meetings.

Book a demo

Ready to standardize operations?

See FOS mapped to your industry and modules in a focused 30-minute session — no obligation, no generic pitch deck.

  • Structured implementation plan
  • Industry-specific scope
  • Response in 1 business day