Planning & MRP

Planning & MRP — Every Sales Order Becomes a Material Plan

FOS explodes each sales order against its BOM, runs MRP, reserves stock and raises exactly the work orders and purchases you need — with shortages flagged before they hit the floor.

Order to plan in one run · Feeds Production & Purchase

  • Live Stock visibility
  • 1 run Order to plan
  • Clear Dispatch visibility
  • 0 Surprise shortages

Answer

What is MRP software?

MRP software calculates material and capacity demand from sales orders and forecasts by exploding bills of materials, netting on-hand and on-order stock, and proposing work orders and purchases. In FOS ERP, Planning & MRP uses the same BOMs and inventory as Production and Purchase, so shortages appear before the shop floor stops.

Why teams switch

You have the orders. You just can't plan them.

Planning isn't another spreadsheet. It's one MRP run from sales order to work orders, purchases and a date you can promise.

Walk through the product
  1. 01
    Plans on last week's stock

    MRP runs against stale counts — so the plan is wrong before it starts.

  2. 02
    Shortages on the shop floor

    Material gaps discovered mid-job — not when MRP could have flagged them.

  3. 03
    Purchase reqs raised too late

    Buyers scramble after the shortage — not when lead time still allows.

  4. 04
    Promise dates that are guesses

    Customers get dates from optimism — not capacity and material reality.

  5. 05
    Production runs blind

    The floor executes against a plan nobody trusts — and replans every week.

Product walkthrough

Three moments. One committed plan.

From sales order to work orders, purchases and a promise date the whole plant can run on.

NetBOM · Stock · Demand
ScheduleCapacity · Promise dates
ControlShortages · Requisitions

Explode & net

One run, every requirement.

MRP reserves available stock, raises work orders, and flags shortages as purchase requisitions — before they ever reach the floor.

  • BOM explosion to the last leaf
  • Automatic stock reservation
  • Shortages → purchase requisitions
MRP run · SO-4821
WOChassis weld assemblyWork order raised · qty 6Planned
PRIS Angle 65×65 · 1.2 TShortage → purchase reqShortage
STM16 fasteners · 480 pcsReserved from stockReserved
SO → work orders + POsAuto
Connected platform

Plans flow straight into Production & Purchase

Work orders hit the shop floor. Shortages become purchase requisitions. No re-keying between modules.

Planning & MRP SO → BOM → plan You are here
Capability map

Everything planning needs — in one engine

BOMs, MRP, capacity and shortage control — one connected planning core.

BOM managementMulti-level, alternate, revisions
MRP engineNet requirements, reservation
Capacity planningWork centres, load view
Production planOrder-wise, promise dates
Shortage managementLive shortages, auto PR
Demand forecastHistory, seasonality

Our MRP used to take two planners a full day every week. Now one run nets every order — and shortages show up days before they hit welding, not during it.

Executive briefing

Plan every order with confidence.

A focused 30-minute walkthrough of MRP, scheduling and shortage control — mapped to your BOMs and shop-floor reality.

  • Structured implementation plan
  • Industry-specific scope
  • Response in 1 business day

Frequently asked questions.

Top questions about MRP software for manufacturing — answered for manufacturers in India.

What planning capabilities does FOS provide?

FOS planning includes demand management, MRP, capacity visibility, and production scheduling for discrete manufacturers. It explodes BOMs, suggests purchase and work orders, and highlights shortages before they stop the line.

Does FOS support multi-level BOM MRP?

Yes. Multi-level BOM explosion handles assemblies, sub-assemblies, purchased parts, and phantom items. MRP respects lead times, safety stock, and order policies to generate actionable purchase and production proposals.

How does FOS handle make vs buy decisions?

MRP distinguishes manufactured and purchased items, generating work orders for in-house production and purchase requisitions for bought-out parts. Subcontract operations appear as planned orders with material issue requirements.

Can planners see capacity constraints?

Planners view load against work centres and calendars, identifying overloads before releasing orders. Finite scheduling options help sequence jobs at bottleneck operations common in fabrication and machining plants.

What MRP exception reports are available?

Standard exceptions include shortages, excess stock, rescheduled orders, and past-due supply. Planners action exceptions daily instead of discovering material gaps on the shop floor.

Does planning support batch and lot sizing rules?

FOS supports fixed lot, lot-for-lot, minimum order quantities, and order multiples per item. These rules reflect how you buy plate, castings, or standard components from vendors.

How are sales order changes reflected in MRP?

Order quantity or date changes regenerate dependent demand and rescheduled supply suggestions. Planners see impact on procurement and production immediately rather than after manual spreadsheet updates.

Can we plan across multiple warehouses?

Multi-warehouse MRP considers stock at each location, transfers, and site-specific lead times. Central planning teams coordinate material for plants that share common purchased parts.

Is rough-cut capacity planning included?

Rough-cut and detailed capacity views help align master schedule with available hours at welding, machining, or assembly centres. This prevents accepting orders the plant cannot build on time.

How long does it take to stabilise MRP after go-live?

Most plants run weekly MRP cycles within the first month after master data cleanup. FOS implementation includes BOM and inventory validation so the first MRP run produces trustworthy proposals.

Book a demo

Ready to standardize operations?

See FOS mapped to your industry and modules in a focused 30-minute session — no obligation, no generic pitch deck.

  • Structured implementation plan
  • Industry-specific scope
  • Response in 1 business day